The terminal will be developed within the 5,000 acres of coastal land owned by NIOC, located 65km west of Jask near Mubarak Mount. It will include 20 floating roof metal storage tanks with a capacity of 500,000 barrels each. Crude oil storage tanks are being constructed with ten million barrels of storage in the first phase. Future expansions are planned to increase the terminal storage capacity to more than 30 million barrels. The terminal will also include loading and unloading wharves, offshore facilities including three single-point mooring (SPM), and other infrastructure for import/export oil. The offshore section facilities included pipeline route and installation of SPM has been awarded to Iranian company. Geophysics and geotechnical survey along the pipeline route and SPM location are conducting by AKAM industry. For performing this projects AKAM110, AKAM2 and AHTs assigned to the project.
|
Jask Oil Terminal